GB NEWENCO LTD

NEWENCO LTD

Description

 

Gas Source = Landfill
Rated capacity = 65 Nm3/h
Rated power = 7,5 kW
Inlet pressure = 100 mBar(g)
Operating pressure = 5,2-5,8 Bar(g)
Gas dew point at discharge = +3/5°C

Installation of a gas processing system in a power generation plant based on microturbine fueled by biogas produced by anaerobic digestion.